| Training video vendor stage | What you do | What it leaves behind |
|---|---|---|
| Brief | Write one brief and send it with the evaluation sheet to three to five suppliers | The same written brief for every supplier |
| Weights | Fix the weights by risk before any proposal arrives | Weights on record |
| Scope sheet | Put every quote on one sheet: module count, running length, languages, review rounds, accessibility, LMS testing, handover files and update window | Quotes that compare like for like |
| Scoring | Score each criterion from zero to three using the evidence column only, with two people scoring independently | Two sets of scores to reconcile |
| Sample | Ask the top two suppliers for a short sample built from one of your own SOPs, on agreed terms | A sample from your own material |
| LMS test and review | Test the sample in your LMS, run one review round and watch how corrections are handled | A test result and a review log |
| Referees | Phone two referees who commissioned a comparable module | Referee notes |
| Decision | Decide against the weighted scores, and pause the shortlist on red flags such as no named accuracy reviewer or no LMS trial | A decision tied to the weights |
To choose a training video vendor, send every shortlisted supplier the same written brief, score each on the same ten criteria, and fix the weights before any proposal arrives. The criteria cover content fit, source handling, review, AI use, languages, accessibility, LMS delivery, files, updates and scope.
Last reviewed: 13 November 2026
Vendor evaluation sheet: a single table scoring every supplier on each criterion, with the evidence behind each score.
What Ten Criteria Should You Score a Training Video Vendor On?
Put the sheet in your RFP. Each row needs an answer from the supplier plus a piece of evidence you can inspect, not a claim.
| # | Criterion | Ask the vendor | Evidence to accept |
|---|---|---|---|
| 1 | Content fit | Which modules like ours have you made, and why does the format suit our audience? | Two similar samples with learner and objective stated |
| 2 | Source handling | How does an SOP, policy or product sheet become a script, and who writes it? | A script extract mapped to its source sections |
| 3 | Review | Who checks accuracy, how many rounds are in scope, who approves? | Named reviewer roles, sample review log |
| 4 | AI use | Where is AI used, and what does a person check before release? | Written list of AI steps, voice and likeness consent terms |
| 5 | Languages | Who writes, records and verifies each language version? | Named native reviewer per language, regional variants stated |
| 6 | Accessibility | What arrives for captions, transcripts and audio description? | Deliverables list per module |
| 7 | LMS delivery | Which package format (SCORM, xAPI or cmi5) is exported, and is it tested on our platform? | Acceptance test plan, sample report |
| 8 | Files and rights | Which project files, scripts, captions and licences are handed over? | Handover list, licence terms for voices, music, footage |
| 9 | Updates | How does a policy change become a revised module? | Written update process naming an owner |
| 10 | Scope and confidentiality | What is excluded, and where are confidential documents stored and who can open them? | Scope sheet, data-handling note |
Accessibility needs its own row because captions alone don't establish conformance: WCAG 2.2 success criterion 1.2.5 separately asks for audio description of prerecorded video at Level AA (W3C). LMS delivery earns a row because platforms interpret SCORM slightly differently, and the hard part is content that's both conformant and broadly compatible (SCORM.com).
How Do You Weight Criteria and Compare Quotes Fairly?
Fix the weights first, so scoring can't drift towards a studio you already favour. Public buyers work this way: US federal acquisition rules require evaluation factors and their relative importance to be stated clearly in the solicitation (Acquisition.gov). Private buyers can borrow that discipline.
Weight by risk. Regulated or safety content deserves the heaviest shares on review, source handling and LMS delivery; a multilingual rollout raises languages. Score each criterion from 0 to 3 using the evidence column only, with two people scoring independently before comparing notes, and agree a tie-breaker in advance.
Then put every quote on one scope sheet: module count, running length, languages, review rounds, accessibility deliverables, LMS testing, handover files and update window. A line an agency omits has not been priced, so request it rather than assuming it's included. Our guide to corporate training video costs in India explains each cost driver with a hypothetical comparison.
How Do You Run the Evaluation From Brief to Decision?
Run the evaluation as one sequence. Write the brief and send it with the sheet to three to five suppliers. Ask the top two for a short sample built from one of your own SOPs, on agreed terms. Test that sample in your LMS, run one review round and watch how corrections are handled. Phone two referees who commissioned a comparable module, then decide against the weighted scores. Comparing a tool with a studio first? See AI avatar tools vs a managed studio and AI vs traditional production.
Which Production Red Flags Should Pause a Shortlist?
A red flag is any answer that shifts risk onto you after signature. Pause the shortlist for these:
- A fixed delivery date quoted before anyone has seen your source material.
- Nobody named to check accuracy, or no sign-off before release.
- A conformance claim resting on captions alone.
- No trial run in your LMS before final delivery.
- Scripts, caption files or project files missing from the handover.
- Vague answers about AI use, or no consent terms for synthetic voices and likenesses.
Where Does Probbit Fit in a Vendor Evaluation?
Probbit is a corporate training video studio and can be one of the suppliers you score. Send us the same brief and sheet. We work with human writing, review and sign-off, agree the LMS package format and acceptance test before committing to delivery, and confirm languages, revision ownership and file handover in the project scope. Timing depends on approved source material, scope, languages and review rounds. To test the sheet on a real module, schedule a call.
